Coryton Power Station

Power station in the UK

51°30′43″N 0°30′29″E / 51.512000°N 0.508000°E / 51.512000; 0.508000StatusOperational as per UK capacity marketConstruction began2000Commission date2002Construction cost£470 million (£0.64m/MW)Owner(s)CreditasOperator(s)Coryton Energy LtdThermal power station Primary fuelNatural gasTurbine technologyCombine Cycle Gas TurbineSite area5.2 hectareChimneys2 (55 metres)Cooling towersAir Cooled Heat ExchangerCooling sourceAir CoolingCombined cycle?YesPower generation Units operational2Make and modelAlstom GT26 A/BNameplate capacity732 MWExternal linksCommonsRelated media on Commons
[edit on Wikidata]

Coryton Power Station is a 732 MW Combined Cycle Gas Turbine (CCGT) gas-fired power station at Coryton, Thurrock, Essex, UK.

History

The site was part of the Coryton Refinery before its closure in 2012. Owned by InterGen, Coryton Power Station was built by Bechtel between 2000 and 2002, and cost £470 million. It was commissioned in 2002 and is run by Coryton Energy Ltd.

The InterGen is owned by Sev.en Global Investments.

Specification

It is a CCGT type power station that uses natural gas. Gas is supplied to the site through a 7 km underground pipeline from an off-take from the National Grid Gas National Transmission System south of Stanford-le-Hope. It has two ABB Alstom GT26 gas turbines driving two electricity generators. Gas turbine exhaust gas is led to two heat recovery steam generators. These power one steam turbine, connected to a further generator. The station connects to the electricity National Grid at the nearby 400 kV Coryton South substation.

Gateway Energy Centre

Gateway Energy Centre is a proposed 1250 MW gas-turbine power station to be located on the London Gateway Logistics Park about 1 km west of Coryton power station. It will be either a gas-fired 2 × CCGT plant; a 1 × CCGT plus 1 × Open Cycle Gas Turbine (OCGT) facility, and/or a 320 MW battery energy storage system.[1] It will be developed by InterGen. Original consent was granted in 2011, with subsequent revisions and consents granted in 2014 and 2016. CO2 capture facilities will be installed if mandated.[1] Construction is likely to start in 2022 with commercial operation expected in 2024.[2]

In 2020 InterGen gained consent for a 640 MWh lithium-ion battery storage power station near the site, capable of delivering 320 MW for nearly 2 hours. The £200 million project is expected start in 2022 and become operational in 2024.[3]

See also

  • flagEngland portal
  • iconEnergy portal

References

  1. ^ a b "Gateway Energy Centre". InterGen. 2019. Archived from the original on 11 May 2016. Retrieved 27 January 2020.
  2. ^ "Gateway Energy Centre Power Plant, UK". Power Technology. 30 November 2021. Retrieved 20 February 2022.
  3. ^ Lempriere, Molly (30 November 2020). "UK's largest battery storage project at 640MWh gets go ahead from government". Energy Storage News. Retrieved 21 July 2021.
Wikimedia Commons has media related to Coryton Power Station.
  • Intergen
  • Gazette article
  • v
  • t
  • e
Companies
Power stations
Biomass
Active
Future
  • Peterborough
  • Tilbury Docks
Coal
Closed
Proposed
Gas
Active
Closed
  • Letchworth
Future
Incinerators/waste
Active
  • Thetford
Future
  • Peterborough
Nuclear
Active
Closed
Proposed
Oil
Closed
Wind
Active
Proposed