Kent Downs line

4 ft 8+12 in) standard gaugeElectrification750 V DC third rail
  • v
  • t
  • e
Maidstone line
Legend
Chatham Main Line
to London Victoria
Swanley
Swanley Junction
Chatham Main Line
to Faversham
A20
M25
18 mi 60 ch
30.18 km
Eynsford Tunnel (
828 yd
757 m
)
Lullingstone
(never opened)
19 mi 39 ch
31.36 km
Lullingstone Airfield Lullingstone Airfield
(never opened)
Eynsford Viaduct
over River Darent
Eynsford
20 mi 32 ch
32.83 km
Shoreham
22 mi 52 ch
36.45 km
Otford
24 mi 06 ch
38.74 km
M26
24 mi 53 ch
39.69 km
Otford
(1874–1880)
Bat & Ball
Sevenoaks
Kemsing
26 mi 79 ch
43.43 km
Borough Green & Wrotham
29 mi 52 ch
47.72 km
Offham Siding
West Malling
34 mi 61 ch
55.94 km
East Malling
35 mi 64 ch
57.61 km
Barming
37 mi 43 ch
60.41 km
former Preston
Hall Tunnels
(
33 yd
30 m
&
54 yd
49 m
)
Maidstone East
39 mi 76 ch
64.29 km
Week Street Tunnel (
98 yd
90 m
)
Wheeler Street Tunnel (
358 yd
327 m
)
Bearsted
42 mi 59 ch
68.78 km
Hollingbourne
45 mi 02 ch
72.46 km
Harrietsham
47 mi 36 ch
76.36 km
Lenham
49 mi 11 ch
79.08 km
Charing
53 mi 11 ch
85.52 km
Hothfield Halt
55 mi 61 ch
89.74 km
Ashford West
Ashford International Eurostar
59 mi 19 ch
95.33 km
Mileage from London Victoria

The Kent Downs line is a railway line between Otford and Ashford International in Kent, England. It adopted its current name in 2020, by the Kent Rail Partnership.[2]

It covers a large part of what was known as the Maidstone line which extended further from Otford to Swanley.[3][4] This line diverged from the Chatham Main Line at Swanley Junction, and proceeds down the Darent Valley line[5] to Otford junction,[6] where the Darent Valley line, also known as the Bat & Ball line,[6] divides towards Sevenoaks. Whereas the line now known as Kent Downs, continues via Borough Green & Wrotham and Maidstone East to Ashford, where it joins the South Eastern Main Line.[7]

History

The line was built by the London, Chatham and Dover Railway from their first line (the Chatham Main Line). The final section to Ashford opened on 1 July 1884 and terminated at Ashford West. There was initially no direct connection to the rival South Eastern Railway's existing station.[8]

The former Maidstone line, Otford to Ashford form the Kent Downs line, while the remaining parts are on the Darent Valley line.

Upon the creation of the South Eastern and Chatham Railway in 1899, Ashford West was closed and services diverted to the former South Eastern Railway station. The line was electrified in 1939 (750 V DC third rail) to Maidstone East by the Southern Railway prior to World War Two. Electrification between Maidstone East and Ashford was completed in 1961 under the BR 1955 Modernisation Plan.

In 2020 the line from Ashford International to Otford was adopted by the Kent Rail Partnership and this section was renamed the Kent Downs line.[2]

Infrastructure

Traction current is supplied at 750 volts DC via the Third Rail. The supply for this is overseen by Paddock Wood Electrical Control Room.[6] Signalling is Track Circuit Block with multiple aspect colour light signals throughout, controlled by Maidstone East Signal Box.[6] The line is double track throughout.

Services

Services on the line are run by Southeastern. Services run to London Victoria, London Charing Cross and Ashford, with some peak services to London Blackfriars.

In the off-peak, there are one train per hour from Ashford International to London Victoria via Bromley South and Swanley stopping at all stations between Ashford and Otford and one train per hour from Maidstone East to London Charing Cross running semi-fast via Swanley and London Bridge. These services are operated by Class 375 and Class 377 EMUs.

Thameslink utilises the route between Swanley and Otford on their London Blackfriars to Sevenoaks metro services via the Catford Loop and Elephant and Castle with two trains per hour running. Additional services through London will be introduced as part of the Thameslink Programme between Cambridge and Maidstone East. As of June 2024, these services have not yet been introduced with no news about their future.[9]

References

Wikimedia Commons has media related to Maidstone East Line.
  1. ^ "SBJ mileages".
  2. ^ a b "KDL". Retrieved 15 February 2022.
  3. ^ Network Rail (April 2001). Southern Appendix. Vol. Module SO. p. 1/12. A0260A03. Retrieved 12 January 2012
  4. ^ Quail Map 5 – England South & London Underground [pages 6,7 & 11A ] February 1998 (Retrieved 12 January 2012)
  5. ^ "Darent Valley CRP". Thameslink.
  6. ^ a b c d Network Rail (April 2001). Southern Appendix. Vol. Module SO. p. 1/64. A0260A03. Retrieved 12 January 2012
  7. ^ Network Rail (April 2001). Southern Appendix. Vol. Module SO. p. 1/54. A0260A03. Retrieved 12 January 2012
  8. ^ Mitchell & Smith 1994, Historical Background.
  9. ^ "Further delay for 'long-suffering' rail users". BBC News. 20 September 2019. Retrieved 30 July 2020.
  • Mitchell, Vic; Smith, Keith (1994). Swanley to Ashford. Midhurst: Middleton Press. ISBN 1 873793 45 6.
  • Yonge, John (October 1994). Gerald Jacobs (ed.). Railway Track Diagrams – Volume 5 England, South and London Underground (1st ed.). Exeter: Quail Map Co. ISBN 1-8983-1907-3.
  • v
  • t
  • e
Primary
International
National
Secondary
Berks/Bucks/Oxon
to London
Kent to London
Surrey/Sussex/Hants
to London
Others
Non-passenger
Heritage

51°16′40″N 0°31′22″E / 51.2778°N 0.5228°E / 51.2778; 0.5228