38°45′24″N 100°06′03″E / 38.75667°N 100.10083°E / 38.75667; 100.10083StatusOperationalConstruction began2002Opening date2004Construction cost$153 million USDOwner(s)Gansu Hexi Hydropower Development Investment Co., Ltd.Dam and spillwaysType of damEmbankment, concrete-face rock-fillImpoundsHeihe RiverHeight146.5 m (481 ft)Length191 m (627 ft)Elevation at crest1,924.5 m (6,314 ft)Dam volume2,530,000 m3 (3,309,115 cu yd)Spillway typeControlled chuteSpillway capacity2,696 m3/s (95,208 cu ft/s)ReservoirTotal capacity86,200,000 m3 (69,883 acre⋅ft)[1]Normal elevation1,920 m (6,299 ft)Power StationCommission date2004Turbines3 x 45 MW
1 x 22 MW
Francis-type[2]Installed capacity157 MWAnnual generation528 GWh

The Longshou II Dam, also referred to as Longshou No. 2, is a concrete-face rock-fill dam on the Heihe River, located 35 km (22 mi) southwest of Zhangye in Gansu Province, China. It is part of the Gansu Heihe Rural Hydropower Development and supports a 157 MW power station.[3] The dam's first feasibility study was carried out in 2000 and river diversion construction began in December 2001. In June 2002, the river was diverted and in September that year, filling of the dam's body began. On 17 August 2004, the first generator was operational with the rest by the end of the year. The 146.5 m (481 ft) high dam withholds a reservoir with a capacity of 86,200,000 m3 (69,883 acre⋅ft). It's spillway is located on the right bank and is a controlled chute type with a discharge capacity of 2,696 m3/s (95,208 cu ft/s).[4] Water is delivered to the dam's power station downstream via a 1.7 km (1 mi) long tunnel.[5] The dam is located upstream of the Longshou I Dam, an 80 m (262 ft) tall double-curvature arch dam with an installed capacity of 52 MW.[6] Upstream is the Xiaogushan Dam, a gravity dam which diverts water to a 102 MW power station.[3]

See also

  • flagChina portal
  • iconWater portal
  • iconRenewable energy portal

References

  1. ^ "China's highest CFRDs". Chinese National Committee on Large Dams. Retrieved 4 September 2011.
  2. ^ "Long's first two (West water) hydroelectric turbine energy characteristics of test" (in Chinese). Senior Engineer Online. Archived from the original on 31 March 2012. Retrieved 4 September 2011.
  3. ^ a b "People's Republic of China: Gansu Heihe Rural Hydropower Development Investment Program: Dagushan Hydropower Project" (PDF). Asian Development Bank. April 2007. Retrieved 4 September 2011.
  4. ^ "Longshou Two Hydropower" (in Chinese). State Electricity Regulatory Commission Dam Safety Supervision Center. Retrieved 4 September 2011.
  5. ^ "Gansu: Long Heihe Hydropower first unit the first two grid" (in Chinese). Gansu Provincial Department of Housing and Urban-Rural Development. Retrieved 4 September 2011.
  6. ^ Berga, L., ed. (2003). Roller compacted concrete dams : proceedings of the IV International Symposium on Roller Compacted Concrete (RCC) Dams, 17-19 November 2003, Madrid, Spain. Rotterdam [u.a.]: Balkema. p. 373. ISBN 90-5809-564-9.